Doc. # 1-3694406002 | |||
---|---|---|---|
Date Updated | 03-12-2019 | Date Created | 03-12-2019 |
Document Type | Knowledge Base | Related OS | |
Related Product | ADAM-5560CDS/ APAX-5580CDS |
How_to_avoid_PLC_overloading_on_CODESYS | |||
---|---|---|---|
Solution:
Watchdog is an important mechanism to void PLC overloading because of a rapidly increasing task cycle time. Overloading means PLC doesn’t have enough resource to complete the task. An infinite loop is the most common one to cause overloading (> 100%). This document will show how to monitor the PLC load and set watchdog for each task.
|
|||
Download File | Release Date | Download Site | |
[SE_TNE_APAX_CODESYS]_How_to_avoid_PLC_overloading_on_CODESYS.pdf (0) | 03-12-2019 |