Doc. # 1-00000556
Date Updated 10-26-2018 Date Created 09-12-2017
Document Type Knowledge Base Related OS
Related Product 232BSS4
Is the DB9 metal shell connected to pin#1 master shield on the 232BSS4?
Solution:
Yes, all of the shields are tied to signal ground. This is required to pass CE certification.